Cipularang Toll Road KM 84 + 200 A


Purwakarta, West Java

Location:
Cipularang Toll Road, West Java

Scope of Work:

  • 99 bored piles with 800 mm diameter and a total drill length of 1,605 m


Special Features:
Dry hole drilling through claysilt layer


Construction Period:

May - August 2014