Cipularang Toll Road KM 92 + 400


West Java

Location:
West Java

Scope of Works:

  • 120 bored piles with 1,180 mm diameter up to a depth of 34 m
  • Capping beam 5 x 1.5 x 100 m
  • Approximately 75.000 m³ earth moving 
  • Renaturing using selected plantation

 

Special Features:
Dry hole drilling through clayshale formation


Construction Period:
July - December 2013