Tuban Expansion Project - Phase 2


East Java

Location:
East Java


Owner:

P.T. Holcim Indonesia Tbk.

Main Contractor:
P.T. Thyssenkrupp Polysius Indonesia


Scope of Works:

  • 272 bored piles with 800 mm diameter up to a depth of 15 m
  • 39 bored piles with 900 mm diameter up to a depth of 20 m
  • 65 bored piles with 1,000 mm diameter up to a depth of 17 m
  • 107 bored piles with 1,200 mm diameter up to a depth of 20 m
  • Pile test (PIT, optional)

Special Features:
Dry hole drilling through various lime formation

 

Construction Period:
January – May 2013