References
Have you ever wondered how great projects become reality? Then you've come to the right place. Because we are building the world of tomorrow. Discover our success stories, innovations and the result of outstanding collaboration. Our projects inspire and reflect our passion for excellence. Find out how we turn our customers' visions into reality and deliver top performance in the process. Your next success story could start now!
Bauer Indonesia carried out bored pile foundations for the Taba Penanjung-Bengkulu section of the Trans-Sumatera Toll Road - and this for several bridges.
Bauer Indonesia produced bored piles to a depth of 10 m for the foundation of a new factory plant for the production of starch and sweetener products.
A soldier pile wall protects the access road to the Pertamina refinery from landslides. Our experts deployed a BG 28 to ensure the safety of Jalan Yos Sudarso.
Our experts from Bauer Indonesia carried out soil improvement measures for the expansion of the future Banyuwangi International Airport.
Bauer Indonesia realized a total of 717 bored piles for the 24-storey Dharmawangsa Towers in South Jakarta in addition to the construction pit.
Bauer Indonesia carried out foundation work for the first elevated toll road in East Indonesia – over a total length of 4.5 km.
The experts from Bauer Indonesia installed bored piles with diameters of 1000 mm – and this for the foundation of Buntu Kunik Airport.
Foundation work for the new New Yogyakarta Airport including parking garage or airport mosque by the experts from Bauer Indonesia.
In Makassar, the experts from Bauer Indonesia carried out foundation work for a new port on a newly reclaimed island.
The MPP office building will be a new landmark in Jakarta. Bauer Indonesia carried out foundation and diaphragm wall work for the 266 m high tower.
Prosperity and comfort in Pondok Indah, South Jakarta: Bauer Indonesia carried out the foundation work for the Pondok Indah Mall 3 and Office Tower project.
On track: Bauer Indonesia carried out soil improvement measures using deep soil mixing for the expansion of the Javanese railway network on two tracks.